Sluice Nikisiani

Sluice Nikisiani

Built structure of artificial materials that guide the water flow.

  • Project: Philippi Peatland Water System
  • Climate: Warm mediterranean
  • Year: After 1935
  • Altitude: +48 m.a.s.l
  • Soil condition: Peat
  • Material: Concrete, metal
  • Use or Function: Irrigation and drainage